We have started to prepare for the moving of the 38-foot schooner hull out of the workshop.

So far we have made part of the rolling frame which will be used in conjunction with a crane to turn the hull 180 degrees. We have also started on the hulling dolly which will carry the boat.

The dolly consists of two 6 meters long caterpillers with 10 wheels on each one  a total weight allowance of 16 tonnes

one of the 20 axels waiting for its wheel on the moving caterpiller

 